onlyTrustedInfo.comonlyTrustedInfo.comonlyTrustedInfo.com
Notification
Font ResizerAa
  • News
  • Finance
  • Sports
  • Life
  • Entertainment
  • Tech
Reading: Tsunami-wrecked Fukushima nuclear plant faces new delay in removing melted fuel debris
Share
onlyTrustedInfo.comonlyTrustedInfo.com
Font ResizerAa
  • News
  • Finance
  • Sports
  • Life
  • Entertainment
  • Tech
Search
  • News
  • Finance
  • Sports
  • Life
  • Entertainment
  • Tech
  • Advertise
  • Advertise
© 2025 OnlyTrustedInfo.com . All Rights Reserved.
News

Tsunami-wrecked Fukushima nuclear plant faces new delay in removing melted fuel debris

Last updated: July 29, 2025 10:40 am
Oliver James
Share
2 Min Read
Tsunami-wrecked Fukushima nuclear plant faces new delay in removing melted fuel debris
SHARE

The Japanese operator of the tsunami-wrecked Fukushima Daiichi nuclear power plant on Tuesday said the start of full-scale removal of melted fuel debris will be delayed for several years until 2037 or later, the latest setback underscoring the challenges ahead.

The Tokyo Electric Power Company Holdings, or TEPCO, said it will need 12 to 15 years of preparation before starting full-scale removal of melted fuel debris at the No. 3 reactor. That preparation includes reducing radiation levels and building necessary facilities in and around the reactor.

Overall, at least 880 tons of melted nuclear fuel has mixed with broken parts of internal structures and other debris inside the three reactors that suffered meltdowns at the plant following the 2011 earthquake and tsunami.

The delay again sets back the 2051 target set by Japan’s government and TEPCO for decommissioning the plant.

A test retrieval of a tiny sample of melted fuel debris in November was already three years behind, and some experts estimate that the decommissioning work could take more than a century.

TEPCO said it plans to stick to the current completion target of 2051.

“Realistically, we are aware of the difficulty (to achieve the target) but we will not drop the goal just yet, as we still don’t have a clear work schedule after the full-scale removal begins,” said Akira Ono, chief decommissioning officer at TEPCO.

Ono said TEPCO plans to examine preparation work necessary at the two other reactors within the next couple of years ahead of full-scale melted fuel retrieval.

After small missions by robots to gather samples, experts will determine a larger-scale method for removing melted fuel, first at the No. 3 reactor.

You Might Also Like

‘National Security Threat’: Schumer Holds DOJ Picks Over Trump’s $400 Million Qatari Jet Deal

US ‘thinking about’ easing Russia sanctions – Trump

‘Our lifeline’: Kashmiris fear losing orchards, land to mega Modi projects | Indigenous Rights News

Dozens injured in pension protest outside Argentina Congress

Federal court blocks Trump’s tariffs. Here’s what to know

Share This Article
Facebook X Copy Link Print
Share
Previous Article Joe Flacco on Kenny Pickett’s injury as quarterback race continues: ‘You don’t want to see something like that’ Joe Flacco on Kenny Pickett’s injury as quarterback race continues: ‘You don’t want to see something like that’
Next Article World Aquatics Championships 2025: Gretchen Walsh wins gold in 100m butterfly, Summer McIntosh wins again World Aquatics Championships 2025: Gretchen Walsh wins gold in 100m butterfly, Summer McIntosh wins again

Latest News

As student loan interest restarts for SAVE plan borrowers, some are feeling ‘crushed’
As student loan interest restarts for SAVE plan borrowers, some are feeling ‘crushed’
News July 30, 2025
Lithuania Prime Minister Gintautas Paluckas steps down after investigations and protests
Lithuania Prime Minister Gintautas Paluckas steps down after investigations and protests
News July 30, 2025
Trump’s tariffs face crucial court test on eve of latest deadline
Trump’s tariffs face crucial court test on eve of latest deadline
News July 30, 2025
Kamala Harris leaves door open for potential 2028 presidential run
Kamala Harris leaves door open for potential 2028 presidential run
News July 30, 2025
//
  • About Us
  • Contact US
  • Privacy Policy
onlyTrustedInfo.comonlyTrustedInfo.com
© 2025 OnlyTrustedInfo.com . All Rights Reserved.